AllightPrimax (the registered trade mark of Allight in the Middle East) have completed the installation of four custom solid handling pumping stations for Abu Dhabi’s new airport.
Being one of the most prestigious projects of the Emirates, AllightPrimax/Sykes was highly recommended by ADSSC (Abu Dhabi Sewerage Service Company) to the European based main contractor “Lindenberg”.
The client required a dewatering solution to pump the foul water from ADSSC’s district cooling plant to two different locations of their sewer main plant at a distance of 4.5 km and 3.5 km respectively.
Foul water pumping can be a problem particularly when it needs to be pumped to a greater distance and with high velocity head. Additionally, the customer needed the units for the fast track airport project and requested the delivery within a short period of 6 to 8 weeks.
Thanks to our Dubai team’s dedication, four HH130i pumpsets with Perkins 1106D-66TA (168kW) engines were successfully delivered and commissioned in May 2017. All pumps had additional options such as rear discharge pipe work, flow meter, isolation valve and low flow shutdown protection.
The Primax/Sykes high performance solids handling capabilities with stainless steel internals and superior hydraulic performance was a great advantage over our main competitor. The project was awarded to AllightPrimax based on the technical merits and the reliability of our product in sewer bypass applications.
“Appreciations for your support in completing the project in timely manner to the satisfaction of our client ADAC” – said Mohd. Abu Khail, the Project Manager of Lindenberg-Emirates.
For more information on our complete range of pumps, please call 1300 255 444 or visit our website.